Chinese English  
Home Introduction Culture Structure Stones Edible Fungus Hotel Power Message Contact us
Recent place£º£¾£¾ DACHUANG HYDRAULIC POWER CO., LTD,
Dachuang Hydrulic Power Wanshun Hydrulic Power Luxia Hydrulic¡¡
¡¡Founded in April 2001, it was a Sino-Foreign invested company, mainly running the carry out of hydroelectric developing and hydraulic power projections. DAHEBA Power Station, JIUCHONGJI PowerStation and JINZAOQIAO PowerStation are in the discussion of designing.
¡¡DAHEBA PowerStation is located on the TangKou Stream of HuoTong Stream, with its base location in 900m area of ChangLanQiao in TangKou Stream¡¯s main river way, AnSong Road and the accumulating rain area of 138k©O while the factory is to the right shore of ShuangXi, the branch of TangKou Stream, i.e. At 50m area of back of ChangSuo Bridge in AnSong Road. The accumulating rain area above the factory area, where is 15km away from the county , is 39.59k©O. The capacity of the power station is 3*400kw, the designed water height is 16.2m with the maximum of 18m and minimum of 15m, and the average annual electricity volume to 4956000kw per hour which supports for 4130 hours and 299.6kw.
great dam of DaheBa PowerStation DaheBa PowerStation
¡¡¡¡JIUCHONGJI PowerStation belongs to HouLongXi Waters, locating at 300m area between QianYang and ZhenShan streams, with the accumulating rain area of 22.8k©O. Its factory is near the NanQiao Valley of HouLongXi and the capacity of 2*500kw, the designed water height of 132m, the designed volume of 1.35cubic meter/s with the average annual electricity volume to 4950000kw / hour to last for 4950 hours and total strength of 162kw.
¡¡¡¡The designing JINZAOQIAO PowerStation, which was located in JinZaoXi, the branch of HuoTong Stream, based in 1m point of JINZAOQIAO of PingNan. The water area above the base is 217k©O, the main river 25.3 km long while the factory is 9km down from the base area, opposite to ShangPei Valley, and the accumulating rain area above the factory is 264k©O. The designed capacity of the station is 60 000kw and the total investment amounts to £¤447.5million. It is planning to be in use 2007 and with the annual electricity volume of 156530000kw / hour to support 2609 hours and output 13300kw. The establishment of this power station will increase the electricity volume to 38600000kw / hour to adjust the arrangement in the electric system. So far, the editing of pre-carriable report and projection has finished and presented to PROVINCIAL INSPECTION COMMITTEE for approval. The system of running power station is under designation and ¡°THREE STRAIGHTFORWARD and ONE FLAT¡± project is carried out smoothly.
 
Copyright@2004-2006 DACHUANG GROUP FuJian,All rights reserved
Address:007 of alley no. 1, Huangcheng Road, Pingnan,FuJian,China¡¡¡¡Postalcode:352300¡¡
Fax:0086-593-3322468 ¡¡¡¡Phone:0086-593-3326666¡¡3328888¡¡¡¡Email:office@dachuang.com.cn