¡¡Founded in April 2001, it was a Sino-Foreign invested
company, mainly running the carry out of hydroelectric developing
and hydraulic power projections. DAHEBA Power Station, JIUCHONGJI
PowerStation and JINZAOQIAO PowerStation are in the discussion of
designing.
¡¡DAHEBA PowerStation is located on the TangKou Stream of HuoTong Stream,
with its base location in 900m area of ChangLanQiao in TangKou Stream¡¯s
main river way, AnSong Road and the accumulating rain area of 138k©O
while the factory is to the right shore of ShuangXi, the branch of
TangKou Stream, i.e. At 50m area of back of ChangSuo Bridge in AnSong
Road. The accumulating rain area above the factory area, where is
15km away from the county , is 39.59k©O. The capacity of the power
station is 3*400kw, the designed water height is 16.2m with the maximum
of 18m and minimum of 15m, and the average annual electricity volume
to 4956000kw per hour which supports for 4130 hours and 299.6kw.
 |
 |
| great
dam of DaheBa PowerStation |
DaheBa PowerStation |
¡¡¡¡JIUCHONGJI PowerStation belongs to HouLongXi Waters, locating at 300m area between QianYang and ZhenShan streams, with the accumulating rain area of 22.8k©O. Its factory is near the NanQiao Valley of HouLongXi and the capacity of 2*500kw, the designed water height of 132m, the designed volume of 1.35cubic meter/s with the average annual electricity volume to 4950000kw / hour to last for 4950 hours and total strength of 162kw.
¡¡¡¡The designing JINZAOQIAO PowerStation, which was located in JinZaoXi,
the branch of HuoTong Stream, based in 1m point of JINZAOQIAO of PingNan.
The water area above the base is 217k©O, the main river 25.3 km long
while the factory is 9km down from the base area, opposite to ShangPei
Valley, and the accumulating rain area above the factory is 264k©O.
The designed capacity of the station is 60 000kw and the total investment
amounts to £¤447.5million. It is planning to be in use 2007 and with
the annual electricity volume of 156530000kw / hour to support 2609
hours and output 13300kw. The establishment of this power station
will increase the electricity volume to 38600000kw / hour to adjust
the arrangement in the electric system. So far, the editing of pre-carriable
report and projection has finished and presented to PROVINCIAL INSPECTION
COMMITTEE for approval. The system of running power station is under
designation and ¡°THREE STRAIGHTFORWARD and ONE FLAT¡± project is carried
out smoothly. |
| |
|
 |